Checklist for Shop Floor Improvement

 Check Points for shop Floor Improvement –

  • Online Documentation
  • Daily calibration status and its record
  • Environmental Records / Differential Pressure as per SOP.
  • Physical cleanliness of the area / equipment / instruments.
  • Status labeling of area / equipment / instruments
  • Cleaning and Sanitization records.
  • Area cleaning records.
  • Training records of the employees performing the activity.
  • Availability of job description of employee performing the activity.
  • Procedures are being followed as per SOP.
  • Effective date and review period of SOP.
  • Doer and checker system.
  • Qualification status of new / existing area / equipment / instrument and their records  
  • Equipment / instrument operation / Cleaning records.
  • Verification of safety checks of the instruments / equipment and their records.
  • Solution preparation and destruction records.
  • General Maintenance records.
  • Calibration / revalidation records
  • Data storage and sample storage condition and records.
  • Material issuance and distribution procedure and records.
  • Current effective vs available SOPs / specification / guideline status.
  • Written approved procedure vs actual practices followed.
  • Issuance and destruction records.
  • Availability of approved layout of the area.
  • Pest control measures.
  • SCM related procedural checks.
  • Collection of in-process samples.
  • Reconciliation procedure.
  • Critical manufacturing and processing steps.
  • Yield and other calculations.
  • Standardization records of volumetric solutions.
  • Glassware calibration records.
  • Storage conditions of standard and working reagents / solution /indicators /impurity /  

 raw and packing material.

  • Records of primary standards, secondary standards and reference material.
  • Records of microbiological media / standard cultures.
  • Labeling procedures.
  • Procedure for the handling and disposal of chemical and biological Waste.
  • Calibration calendar and its compliance.
  • Preventive maintenance calendar and its compliance.
  • Building maintenance records.
  • Work orders.
  • Cleaning and Sanitization of the containers for API and /or excipient.
  • Physical segregation of approved / under test / rejected materials.
  • Procedure for verification of gross weight, tare weight and net weight.
  • Types of documents and records to be checked shall vary for area to area and Equipment  

 to equipment.

Leave a Reply